Service Infiniti QX4 since 1996 of release
1. Introduction
2. The maintenance instruction
3. Routine maintenance
4. The engine
5. Cooling and heating systems
6. Power supply systems and managements
7. Start and charge systems
8. A transmissionnaja line
8.1. 4-step automatic transmission
8.2. A distributing box
8.3. Differentials, power shafts / semiaxes
8.3.1. The general information and check of a condition of components
8.3.2. Removal and installation of differentials
8.3.3. Replacement of a sealing lining of forward differential
8.3.4. Removal and installation of a connecting flange and replacement of an epiploon of back differential
8.3.5. Removal, service and installation of the oil pump
8.3.6. Removal and installation of back semiaxes
8.4. Kardannye shaft
9. Brake system
10. A suspension bracket and a steering
11. A body
12. An electric equipment
 












8-3-3-zamena-uplotnitelnojj-prokladki-perednego-differenciala.html

8.3.3. Replacement of a sealing lining of forward differential

 PERFORMANCE ORDER

  1. Merge a lubricant liquid and remove a back cover of forward differential.
  1. Remove a sealing lining.
  1. Prepare a new lining.
  2. Installation is made in an order, the return to an order of dismantle of components.


On page back
8.3.2. Removal and installation of differentials
On the following page
8.3.4. Removal and installation of a connecting flange and replacement of an epiploon of back differential