Service Infiniti QX4 since 1996 of release
1. Introduction
2. The maintenance instruction
3. Routine maintenance
4. The engine
5. Cooling and heating systems
6. Power supply systems and managements
7. Start and charge systems
8. A transmissionnaja line
8.1. 4-step automatic transmission
8.2. A distributing box
8.3. Differentials, power shafts / semiaxes
8.3.1. The general information and check of a condition of components
8.3.2. Removal and installation of differentials
8.3.3. Replacement of a sealing lining of forward differential
8.3.4. Removal and installation of a connecting flange and replacement of an epiploon of back differential
8.3.5. Removal, service and installation of the oil pump
8.3.6. Removal and installation of back semiaxes
8.4. Kardannye shaft
9. Brake system
10. A suspension bracket and a steering
11. A body
12. An electric equipment
 












8-3-2-snyatie-i-ustanovka-differencialov.html

8.3.2. Removal and installation of differentials

 PERFORMANCE ORDER

  1. Remove forward propeller a shaft (Removal and installation карданных shaft see), — at once закупорьте an aperture in a distributing box for the purpose of the hit prevention in dirt assemblage.
  2. Remove forward section of a distributing box.
  3. Remove a power shaft.
  4. Turn out bolts of fastening of assemblage of forward main transfer.
  5. Installation is made upside-down.
  1. In summary fill in in differential assemblage necessary quantity of a lubricant liquid of a demanded grade.


Back differential

 PERFORMANCE ORDER

  1. Поддомкратьте the car also establish it on props (the Scheme of an institution of props for car fixing in the lifted position see an illustration). Prop up also картер assemblages of the back bridge.
  2. Merge a lubricant liquid.
  3. Having marked original landing position, remove back propeller a shaft (Removal and installation карданных shaft see), — at once закупорьте an aperture in a distributing box for the purpose of the hit prevention in dirt assemblage.
  4. Remove semiaxes (Removal and installation of back semiaxes see).
  5. Отсоедиинте electroconducting from wheel gauges ABS.
  6. Turn out bolts of fastening of differential to картеру the back bridge.
  7. Turn out bolts of fastening of assemblage of back main transfer.
  1. Installation is made upside-down, — track correctness of placing of a sealing lining.
  1. In summary fill in in differential assemblage necessary quantity of a lubricant liquid of a demanded grade.


On page back
8.3.1. The general information and check of a condition of components
On the following page
8.3.3. Replacement of a sealing lining of forward differential