Service Infiniti QX4 since 1996 of release
1. Introduction
2. The maintenance instruction
3. Routine maintenance
4. The engine
5. Cooling and heating systems
6. Power supply systems and managements
7. Start and charge systems
8. A transmissionnaja line
8.1. 4-step automatic transmission
8.2. A distributing box
8.2.1. The general information
8.2.2. Removal and installation of a distributing box
8.2.3. Removal and installation приводного the electromotor of an actuation mechanism of a distributing box
8.2.4. Replacement of the oil filter of a distributing box
8.2.5. Replacement of epiploons of a target shaft of a distributing box
8.2.6. Replacement of an epiploon of a rod of switching of a distributing box
8.3. Differentials, power shafts / semiaxes
8.4. Kardannye shaft
9. Brake system
10. A suspension bracket and a steering
11. A body
12. An electric equipment
 












8-2-6-zamena-salnika-shtoka-pereklyucheniya-razdatochnojj-korobki.html

8.2.6. Replacement of an epiploon of a rod of switching of a distributing box

 PERFORMANCE ORDER

  1. Remove forward propeller a shaft.
  2. Remove a connecting flange (Replacement of an epiploon of lengthening of transmission see).
  1. Disconnect a control lever from the executive lever of a drive of switching, then remove the executive lever.
  1. Having hooked a suitable screw-driver, remove an epiploon of a rod of switching.
  1. Preliminary having greased sealing sponges with universal greasing, fill a new epiploon in a landing nest and запрессуйте it by means of cylindrical send in which quality it is possible to use a replaceable face head approaching on the size or a piece of a pipe of the corresponding diameter. The edge send should rest only against a rigid face surface of an epiploon.
  1. The further installation is made in an order, the return to an order of dismantle of components.


On page back
8.2.5. Replacement of epiploons of a target shaft of a distributing box
On the following page
8.3. Differentials, power shafts / semiaxes