Service Infiniti QX4 since 1996 of release
1. Introduction
2. The maintenance instruction
3. Routine maintenance
4. The engine
5. Cooling and heating systems
6. Power supply systems and managements
7. Start and charge systems
8. A transmissionnaja line
8.1. 4-step automatic transmission
8.2. A distributing box
8.2.1. The general information
8.2.2. Removal and installation of a distributing box
8.2.3. Removal and installation приводного the electromotor of an actuation mechanism of a distributing box
8.2.4. Replacement of the oil filter of a distributing box
8.2.5. Replacement of epiploons of a target shaft of a distributing box
8.2.6. Replacement of an epiploon of a rod of switching of a distributing box
8.3. Differentials, power shafts / semiaxes
8.4. Kardannye shaft
9. Brake system
10. A suspension bracket and a steering
11. A body
12. An electric equipment
 












8-2-5-zamena-salnikov-vykhodnogo-vala-razdatochnojj-korobki.html

8.2.5. Replacement of epiploons of a target shaft of a distributing box

 PERFORMANCE ORDER

  1. Merge from a distributing box a lubricant liquid.
  2. Remove forward section of system of release of the fulfilled gases and a thermofilter.
  3. Remove forward propeller a shaft (Removal and installation карданных shaft see).
  1. By means of a special key release a counternut of a connecting flange.

The counternut is subject to replacement without fail.

  1. With paint mark position of a connecting flange concerning a carving pin.
  1. Remove a connecting flange by means of a stripper.
  1. Having taken advantage of the special adaptation take an epiploon from a forward casing.
  1. Establish a new epiploon, preliminary having greased its sealing sponges with universal greasing.
  2. Establish a connecting flange.
  1. Tighten a counternut of a connecting flange with demanded effort.
  1. Establish propeller a shaft.
  2. Installation of the remained components is made in an order, the return to an order of their dismantle.


Back epiploon

 PERFORMANCE ORDER

  1. Remove back propeller a shaft.
  2. Take a back epiploon from a landing nest in the case of a distributing box.
  1. Preliminary having greased sealing sponges with universal greasing, plant a new epiploon and запрессуйте it in a nest by means of cylindrical send in which quality it is possible to use a replaceable face head approaching on the size or a piece of a pipe of the corresponding diameter. The edge send should rest only against a rigid face surface of an epiploon.
  1. Establish into place back propeller a shaft.


On page back
8.2.4. Replacement of the oil filter of a distributing box
On the following page
8.2.6. Replacement of an epiploon of a rod of switching of a distributing box