Service Infiniti QX4 since 1996 of release
1. Introduction
2. The maintenance instruction
3. Routine maintenance
4. The engine
5. Cooling and heating systems
6. Power supply systems and managements
7. Start and charge systems
8. A transmissionnaja line
8.1. 4-step automatic transmission
8.1.1. The general information
8.1.2. Problem diagnostics АТ - the general information
8.1.3. The Elektronno-hydraulic control system 4-step АТ
8.1.4. Removal and transmission installation
8.1.5. Replacement of an epiploon of lengthening of transmission
8.1.6. Removal and installation of cooler ATF
8.1.7. Removal and installation клапанной assemblages of a hydraulic contour of management АТ
8.1.8. Removal, check of a condition and installation приводного a cable of blocking of switchings
8.1.9. Adjustment of a drive of switching АТ
8.1.10. Adjustment of the gauge-switch of positions АТ / start permissions
8.1.11. Major repairs АТ
8.2. A distributing box
8.3. Differentials, power shafts / semiaxes
8.4. Kardannye shaft
9. Brake system
10. A suspension bracket and a steering
11. A body
12. An electric equipment
 












8-1-7-snyatie-i-ustanovka-klapannojj-sborki-gidravlicheskogo-kontura-upravleniya-at.html

8.1.7. Removal and installation клапанной assemblages of a hydraulic contour of management АТ

The detailed description of a design, principle of functioning and service and major repairs procedures клапанной assemblages is resulted in the Management on automatic transmissions of series АРУС № 179 (ISBN 5-89744-069-7).

Fastening details клапанной assemblages of management АТ

Length of bolts, mm:

AND — 33
IN — 45


 PERFORMANCE ORDER

  1. Remove forward section of system of release of the fulfilled gases.
  1. Remove the pallet картера with a sealing lining and merge ATF.
  1. In case of need remove the gauge of temperature ATF.
  1. Remove the mesh filter.
  2. Disconnect electroconducting, turn out fixing bolts (try to remember adjusting position of bolts) and remove клапанную assemblage (see an illustration of the Detail of fastening клапанной assemblages of management АТ).
  1. In case of need make replacement of the failed internal components клапанной assemblages, for extraction of accumulators And, In, With and D take advantage of compressed air.
  1. Assemblage and installation are made in an order, the return to an order of dismantle of components, — do not forget to replace all sealing elements, track, that all fixture has been tightened with demanded effort.


On page back
8.1.6. Removal and installation of cooler ATF
On the following page
8.1.8. Removal, check of a condition and installation приводного a cable of blocking of switchings